When using a street name on the application that has been changed, please include the current name as well as any previous name.If possible, please provide a city, county or topographical map of the area, showing the proposed installation.You must complete the question on the Exhibit "A" that indicates you have called the Fiber Optic Hot Line and include the ticket number that you have been given. If there is a valid reason why compliance with the railroad standards is not possible, these reasons must be clearly explained or the application will be rejected and returned to you for further explanation. To purchase a copy of these AREMA guidelines send an Application to AREMA. Union Pacific Railroad follows AREMA Manual for Railway Engineering Chapter 1 - PART 5 Pipelines. Please review the Sample Copy of Exhibit "A" which is provided to enable you to complete the form as accurately as possible. Please complete our online application process and avoid the time delays, expense and uncertainty of mailing the application to us.If it is necessary to enter the railroad company's property to conduct a survey for the completion of required location information in this application, the Permit To Be On Railroad Property for Utility Survey form must be printed, executed and returned following the instructions given in the permit.Pipeline Installation Procedures for Crossings Procedures for New Pipeline Crossings
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |